BRK Price sensitive 8 May 2025, 8:21 AM

Bruins Well on Track for 2Q2025 Production and First Sales

Brookside Energy Ltd

Brookside Mobilizes for Bruins Well Production

Key points

  • Completion operations underway at Bruins Well in SWISH Play, Oklahoma
  • First production and sales on track for 2Q 2025
  • Key part of Brookside's 2025 strategy for inventory growth and cash flow

Full summary

Brookside Energy Ltd has mobilized completion crews and equipment with operations now underway at the Bruins Well, located within its SWISH Play acreage in the Anadarko Basin, Oklahoma. First production and sales from the Bruins Well remain on track for the second quarter of 2025. The Bruins Well is Brookside's ninth operated well in the SWISH Play and a key part of the Company's 2025 strategy, which is targeting disciplined inventory growth, operational excellence, and near-term cash flow generation. Completion equipment, including pumps, storage vessels, and related equipment, is now in place or mobilizing to the Bruins Well location. 24-hour operations are scheduled to commence next week, with the well to be completed using high-intensity, multi-stage hydraulic fracturing. Following completion, crews will demobilize to make way for the drill-out of isolation plugs. Once plug removal is complete, production tubing will be installed, and flowback operations will begin, paving the way for initial production and sales in the second quarter.

Summary generated by a large language model. Please interpret with care.

Sign in for more about this company, including guidance changes and other insights.
Sign in