Bruins Well Stimulation Operations Completed

Open PDF
Stock Brookside Energy Ltd (BRK.ASX)
Release Time 27 May 2025, 8:20 a.m.
Price Sensitive Yes
 Bruins Well Stimulation Operations Completed
Key Points
  • Bruins Well stimulation operations completed safely, on time and within budget
  • All stages executed as per the pre-completion design
  • Preparations underway to commence flow-back and testing
  • First sales remain on schedule for 2Q2025
Full Summary

Brookside Energy Ltd has announced the successful completion of stimulation operations on the Bruins Well, its ninth operated well in the SWISH Play in the core of the southern SCOOP Play in the Anadarko Basin. The high-intensity fracture stimulation of this Woodford Formation well was executed with a total of 42 stages, all of which were successfully completed. Real-time monitoring during the operations confirmed that each stage effectively stimulated the reservoir, with pressures, sand, and fluid volumes aligning with the pre-completion design. The composite plugs which served as check valves to provide zonal isolation during the high-intensity multistage stimulation of the well have now been successfully drilled out and production tubing has been installed. The well is now being prepared for flow-back, testing and first sales which are targeted for 2Q2025. Brookside's Managing Director, David Prentice, expressed the company's satisfaction with the safe and efficient completion of the stimulation operations, on time and on budget. He noted that the Bruins Well represents another important step in the development of Brookside's SWISH Play acreage and looks forward to the well contributing to cash flow and further validating the quality of the company's acreage.