Replacement FY2026 Quarter 1 EKJV Exploration Report

Open PDF
Stock Tribune Resources Ltd (TBR.ASX)
Release Time 10 Dec 2025, 5:42 p.m.
Price Sensitive Yes
 Replacement FY2026 Quarter 1 EKJV Exploration Report
Key Points
  • 671 metres of drilling completed at Sadler and Ambition prospects
  • High-grade intercepts of up to 15.09 g/t Au at Ambition
  • Further drilling planned to test potential extensions of Sadler mineralisation
Full Summary

Tribune Resources Ltd has released a replacement EKJV exploration report for Q1 FY2026, withdrawing the previous announcement and providing additional disclosures. During the quarter, a total of 671 metres of drilling was completed, including surface diamond drilling at the Sadler prospect to test potential southerly extensions of the mineralisation, and resource targeting RC and DD at the Ambition prospect. Assay results from the previous quarter's drilling at Ambition were received, highlighting several high-grade intercepts including 0.6m @ 15.09g/t Au, 0.68m @ 8.31g/t Au, and 0.4m @ 7.82g/t Au. These results will inform the next phase of exploration planning at Ambition. For the Sadler prospect, a further 1,054 metres of diamond drilling is scheduled for completion in Q2 FY26, with pending assay results expected to inform potential expansion of the current mineral resource.

Outlook

For the Sadler prospect, the remaining 1,054 metres of diamond drilling is scheduled for completion in Q2 FY26, with pending assay results expected to inform further targeting and potential expansion of the current mineral resource. For the Ambition prospect, assay results received this quarter will be incorporated into an updated geological and resource model, and interpretation of the emerging high-grade, southward-plunging zone will guide the design of future drilling.