DES Price sensitive 9 Mar 2026, 9:18 AM

9km-Long Active Gold Zone at Koba with Exploration Underway

Desoto Resources Ltd

9km-Long Active Gold Zone at Koba with Exploration Underway

Key points

  • Initial reconnaissance at Koba has identified a large and active artisanal mining zone, approximately 9km-long and up to 1km-wide
  • Dump sampling has returned gold grades up to 15.2g/t Au
  • Soil sampling programs have been completed with results pending

Full summary

DeSoto Resources has commenced exploration at its Koba Project, located in the south-central Siguiri Basin in north-eastern Guinea. Initial reconnaissance at Koba has identified a large and active artisanal mining zone, approximately 9km-long and up to 1km-wide. Dump sampling from this zone has returned gold grades of up to 15.2g/t Au. Given the size and scale of the artisanal mining activity, the company has completed initial soil sampling programs with results pending. The Koba Project is situated between the 4Moz Tri-K Deposit (Managem) and the 7.73Moz Bankan-Kiniero deposits (PDI/RXR Merge Co), and was initially prioritized within a target corridor identified by the company's Chairman and Non-Executive Director. The company's systematic exploration approach integrates regolith and artisanal mapping, BLEG stream sediment sampling, soil geochemistry, geophysics and follow-up drilling, with the objective of delineating large-scale gold systems comparable to those already defined elsewhere within the Siguiri Basin.

Outlook

Further soil sampling lines (200m x 800m) have been added south of the active zone as new sites are identified and mapped. Infill soil sampling (200m x 200m) will be completed to vector zones of gold continuity. Upon receiving soil sampling results, airborne geophysics, trenching and power auger drill programs will be completed ahead of maiden drilling programs.

Summary generated by a large language model. Please interpret with care.

Sign in for more about this company, including guidance changes and other insights.
Sign in