High-Grade Gold Results Continue to Extend Main Zone South
| Stock | PC2.ASX (PC2.ASX) |
|---|---|
| Release Time | 4 May 2026, 8:16 a.m. |
| Price Sensitive | Yes |
High-Grade Gold Results Continue to Extend Main Zone South
- New results reported for six additional holes, with standout high grade intercepts in four holes
- Mineralisation now extended approximately 120m along strike to south of MRE and remains open along strike and down plunge
- Drilling is ongoing to determine the extents of this high grade mineralisation
PC Gold Ltd is pleased to report strong results from ongoing resource definition drilling targeting the recent discovery of the Main Zone Southern Extension at the Spring Hill Gold Project. Drilling at the Main Zone Extension has returned multiple significant intercepts, confirming continuity of mineralisation and extending the high-grade core approximately 120 metres along strike to the south of the current resource boundary. Mineralisation remains open along strike and down plunge. Key results include 10.0m @ 4.51 g/t Au from 161m, 11.5m @ 1.12 g/t Au from 227.5m and 4m at 2.30g/t Au from 245m (MS-012), 6.1m @ 2.94 g/t Au from 209m & 1.5m @ 30.44 g/t Au from 237m (MS-006), 6.6m @ 2.90 g/t Au from 199m (MS-010), and 6.9m @ 2.19 g/t Au from 190m & 2.1m @ 4.44 g/t Au from 224.9m (MS-004). Importantly, these intercepts occur within the current pit optimisation shell in areas with limited to no drilling, highlighting the potential to delineate additional mineralisation within the existing open pit and underground development plan. Two diamond rigs remain active on this target as part of the approved resource definition drill program within the planned open pit footprint.
Ongoing drilling with three rigs soon to be operating on the Link and Main zones, with results pending for in-fill drilling on the Link zone and targeting additional Link-style mineralisation across the project. Ongoing resource modelling by Cube with the updated MRE due out in June 2026.