BRK Price sensitive 21 May 2026, 8:21 AM

SWISH AOI Pad Ready to Accept Rig

Brookside Energy Ltd

Brookside Energy Updates on SWISH AOI Rig Mobilization

Key points

  • SWISH AOI two-well development pad ready for rig mobilization
  • Conductor set for Sabres and Whalers wells
  • Key vendors contracted and surface production facilities under construction
  • Designed to support smooth transition from drilling to first sales

Full summary

Brookside Energy Limited (ASX: BRK) has provided an operational update on its preparations for a two-well development program in the SWISH Area of Interest (AOI) in the Anadarko Basin, Oklahoma. The 20' conductor has been set for the Sabres and Whalers wells, with pad construction and lease access works complete. Key operations vendors have been contracted, and surface production facilities are under construction. The program aims to support a smooth transition from rig mobilization through drilling, completion, production facility tie-in, and first sales.

Summary generated by a large language model. Please interpret with care.

Sign in for more about this company, including guidance changes and other insights.
Sign in