MAG Price sensitive 18 Jun 2026, 8:33 AM

Phase 3 Drill Program Completed at Weebo Gold Project

Magmatic Resources Ltd

Phase 3 Drill Program Completed at Weebo Gold Project

Key points

  • Phase 3 drilling completed with 6,573m
  • 2,112m of RC and 4,461m of AC drilling
  • RC targets deeper bedrock at four prospects
  • AC drilling advances three prospects
  • Assay results expected from July 2026

Full summary

Magmatic Resources Limited (ASX:MAG) has completed its Phase 3 drill program at the Weebo Gold Project in the Eastern Goldfields of Western Australia. The program totaled 6,573 meters, comprising 2,112 meters of Reverse Circulation (RC) and 4,461 meters of Air Core (AC) drilling. The RC drilling targeted deeper bedrock at four prospects, building on anomalies from previous phases, while the AC drilling aimed to advance three prospects towards RC drill-ready status. All drill samples have been sent to the ALS laboratory, with assay results expected from July 2026.

Outlook

Magmatic Resources anticipates a steady flow of assay results from July 2026, which will provide insights into the potential of the Weebo Gold Project.

Summary generated by a large language model. Please interpret with care.

Sign in for more about this company, including guidance changes and other insights.
Sign in