Beachcomber Grows into a Major Gold System
| Stock | BPM Minerals Ltd (BPM.ASX) |
|---|---|
| Release Time | 22 Jun 2026, 8:14 a.m. |
| Price Sensitive | Yes |
BPM Minerals Announces Significant Gold Mineralisation at Beachcomber
- Beachcomber Prospect confirmed as a large gold system
- Multiple mineralised lodes discovered
- Significant gold intercepts at Beachcomber NW, Fault, and Central Prospects
- Highest single-metre assay result of 85.61 g/t Au at Beachcomber Central
BPM Minerals Ltd (ASX: BPM) has reported significant gold mineralisation results from the recently completed RC drilling program across the Beachcomber Prospect, including the Beachcomber NW, Beachcomber Fault, and Beachcomber Central Prospects. The results confirm the broader Beachcomber Prospect as an emerging large gold system consisting of multiple mineralised lodes associated with the Yellow Dam Shear Zone. Significant intercepts include 15m @ 1.40 g/t Au from 80m at Beachcomber NW, 12m @ 1.37 g/t Au from 114m at Beachcomber Fault, and the highest single-metre assay result of 85.61 g/t Au from 91m at Beachcomber Central. These results validate the use of ultrafine fraction soil sampling as a key exploration tool. The Company plans to continue testing the mineralised lodes with further drilling.
The Company plans to continue exploring the mineralised lodes at Beachcomber with further drilling, and a maiden drill program at Bonnie & Clyde is anticipated to commence in Q3 2026.