Mineral Resource Increase at Mineral Hill

Open PDF
Stock Kingston Resources Ltd (KSN.ASX)
Release Time 24 Jun 2026, 9:14 a.m.
Price Sensitive Yes
 Kingston Resources Announces 50% Mineral Resource Increase at Mineral Hill
Key Points
  • SOZ Resource grows by 50% from 4.36Mt to 6.54Mt
  • Measured and Indicated tonnage increased by 38% to 3.05Mt
  • Inferred Resource tonnage increased by 62% to 3.49Mt
  • Additional 25,000m of drilling planned over the next 12 months
Full Summary

Kingston Resources Limited (ASX: KSN) has reported a substantial upgrade to the Mineral Resource Estimate (MRE) for the Southern Ore Zone (SOZ) at Mineral Hill. The MRE has increased by 2.1Mt with extensions at depth and in areas close to existing development. The SOZ Resource has increased by 50% from 4.36Mt to 6.54Mt, with Measured and Indicated tonnage rising by 38% to 3.05Mt and Inferred Resource tonnage increasing by 62% to 3.49Mt. The increase follows the completion of 26 drill holes for 3,413m. This update validates the Company's geological model, confirms mineralisation remains open and extends beyond previous resource boundaries, and demonstrates the effectiveness of the ongoing drilling campaign. Kingston Resources plans to conduct an additional 25,000m of drilling over the next 12 months to further expand the scale of the Mineral Hill resource base.