Jupiter Resource Drilling Confirms Priority High-Grade Zones

Open PDF
Stock CRI.ASX (CRI.ASX)
Release Time 13 Jul 2026, 9:25 a.m.
Price Sensitive Yes
 CRITICA LIMITED: Jupiter Resource Drilling Confirms High-Grade Zones
Key Points
  • 145 AC holes completed for 7,274 metres across a 3 km2 area
  • Multiple high-grade intersections, including JPAC273 with 23m @ 3,603 ppm TREO
  • Results confirm continuity of higher-grade mineralisation within targeted areas
Full Summary

Critica Limited (ASX: CRI) has successfully completed its Jupiter Resource Definition Drilling Program, confirming priority high-grade zones within the Jupiter Rare Earth Project. The program involved 145 Air Core (AC) drill holes covering 7,274 metres across a 3 km2 area within the 40 km2 Jupiter Inferred Resource footprint. The drilling intersected broad zones of clay-hosted rare earth mineralisation, with significant intersections including JPAC273 (23m @ 3,603 ppm TREO) and JPAC277 (30m @ 2,995 ppm TREO). These results confirm the continuity of higher-grade mineralisation within targeted optimisation areas and provide a key input into the updated SRK Resource Estimate and Jupiter Scoping Study.

Outlook

The updated Resource Estimate and Scoping Study are expected to further strengthen the technical foundation of the Jupiter Project.