Sunrise Accelerates Expansion Study

Open PDF
Stock Sunrise Energy Metals Ltd (SRL.ASX)
Release Time 23 Jul 2026, 10:32 a.m.
Price Sensitive Yes
 Sunrise Energy Metals Accelerates Expansion Study
Key Points
  • Sunrise is advancing its assessment of an additional 120tpa scandium oxide production train at Syerston.
  • The expanded study program will assess alternative development pathways.
  • FEED for the initial 60tpa development continues to advance well, with commercial production targeted in 2028.
Full Summary

Sunrise Energy Metals Limited is accelerating its studies to assess an expansion of production capacity to 180 tonnes per annum (tpa) of scandium oxide at its Syerston Scandium Project in New South Wales. The expansion study will define the most capital-efficient pathway to lift production capacity. The study leverages the engineering, process design, and cost information generated through the ongoing Front-End Engineering and Design (FEED) Study for the initial 60tpa development. The Company is preserving flexibility in the initial Project design so that additional processing, utility, and tailings capacity can be incorporated efficiently should a decision be made to expand. FEED Study activities for the initial 60tpa development continue to advance across the processing plant, refinery, and supporting infrastructure. The Company's development plan for the initial 60tpa operation remains targeted toward commercial production in 2028.