Flemington PFS Fast-Tracked to Assess Scale-Up to 180 tpa
Open PDF
| Stock | Australian Mines Ltd (AUZ.ASX) |
|---|---|
| Release Time | 27 Jul 2026, 8:52 a.m. |
| Price Sensitive | Yes |
This feature provides summaries of price-sensitive announcements for companies followed by users on InvestorPA.
The summaries are generated by large language models so please interpret with care.
Australian Mines Fast-Tracks Flemington Scandium Project PFS
Key Points
- Flemington Scandium Project PFS fast-tracked to assess scale-up to 180 tpa
- PFS to evaluate potential to increase production from 60 tpa to 180 tpa
- Concurrent drilling program to test potential resource extensions and metallurgical test work
Full Summary
Australian Mines Limited (ASX: AUZ) is fast-tracking the Pre-Feasibility Study (PFS) for its Flemington Scandium Project in New South Wales, Australia, to assess the potential to scale up annual scandium oxide production from 60 tpa to up to 180 tpa. The PFS will be undertaken in parallel with a new drilling program aimed at testing potential extensions to the existing Mineral Resource and providing additional material for metallurgical test work. The PFS follows the delivery of a compelling Scoping Study that demonstrated strong economics with significant leverage to market-aligned pricing scenarios. The study is expected to take 6-9 months to complete.
Sign in to get more information about the company, including guidance changes and other insights.
Sign In