Heads of Agreement for 1GW Data Centre
Open PDF
| Stock | 1414 Degrees Ltd (14D.ASX) |
|---|---|
| Release Time | 27 Jul 2026, 9:54 a.m. |
| Price Sensitive | Yes |
This feature provides summaries of price-sensitive announcements for companies followed by users on InvestorPA.
The summaries are generated by large language models so please interpret with care.
1414 Degrees Signs Agreement for 1GW AI Data Centre
Key Points
- 1414 Degrees partners with a data centre operator for up to 1 GW AI data centre.
- Exclusive access to 40 hectares within Aurora's 1580 hectares.
- Development in stages: 17 MW starter, 200 MW anchor, and gigawatt scale.
Full Summary
1414 Degrees Ltd (ASX: 14D) has entered into a Heads of Agreement with an Australian data centre operator to develop up to 1 GW of AI data centre infrastructure at the Aurora Energy Precinct in South Australia. The precinct is anchored on Aurora's renewable generation and battery storage assets. The operator has been granted exclusivity over an initial 40-hectare development parcel within Aurora's 1580-hectare landholding. The development is proposed in stages: an indicative 17 MW starter campus utilizing the 33kV power connection, a 200 MW anchor campus following the connection of the 275kV transmission line, and a longer-term pathway to gigawatt scale as Aurora's up to 900 MW of solar generation and 140 MW / 280 MWh BESS are built out.
Sign in to get more information about the company, including guidance changes and other insights.
Sign In