Forrestania Resources Announces Upgraded MRE for British Hill
Key points
- Updated MRE for British Hill totals 126,290oz Au at 0.5 g/t Au cut-off
- Indicated Resources increase by 180% to 86,080oz Au
- Ongoing drilling and exploration efforts to further expand resource base
- Conceptual mining studies and metallurgical test work planned
- Significant opportunity for resource expansion and project economics
Full summary
Forrestania Resources Limited (ASX: FRS) has announced a significant upgrade to the Mineral Resource Estimate (MRE) for the British Hill Deposit, totaling 2,620,900 tonnes at 1.50 g/t Au for 126,290oz Au at a 0.5 g/t Au cut-off. This represents a 131% increase from the previous MRE. The Indicated category now holds 1,878,500 tonnes at 1.43 g/t Au for 86,080oz Au, a 180% uplift from the previous MRE. The MRE was supported by a recent 19-hole drill program. An additional 100-hole drill program is approved, with further drilling underway. Conceptual mining studies and metallurgical test work are planned. Forrestania's Chairman, David Geraghty, highlighted the potential for further resource expansion and enhanced project economics.
Outlook
The company believes there remains significant opportunity to further expand the resource base and enhance project economics as they progress technical studies and evaluate future development pathways.
Summary generated by a large language model. Please interpret with care.