Sabres Successfully Drilled and Cased, Whalers Spudded
Open PDF
| Stock | Brookside Energy Ltd (BRK.ASX) |
|---|---|
| Release Time | 5 Aug 2026, 8:21 a.m. |
| Price Sensitive | Yes |
This feature provides summaries of price-sensitive announcements for companies followed by users on InvestorPA.
The summaries are generated by large language models so please interpret with care.
Brookside Energy Updates on Drilling Operations
Key Points
- Sabres well successfully drilled and cased
- Whalers well spudded and drilling underway
- Both wells part of the Suttles pad development
Full Summary
Brookside Energy Limited has announced the successful completion of drilling and casing operations at the Sabres 2-1-1S-3W SXH1 well, reaching the planned depth of approximately 14,200 feet. The production casing was run, cemented, and pressure tested, confirming the integrity of the installation. Following this, drilling has commenced at the Whalers 2-1-1S-3W WXH2 well, targeting the Woodford Formation. Both wells are part of the Suttles pad development program, with Brookside holding an approximate 70% working interest. The company plans to move into simultaneous fracture-stimulation operations once both wells are drilled and cased.
Sign in to get more information about the company, including guidance changes and other insights.
Sign In