S2 Resources Exploration Update
Key points
- Drilling contractor engaged for Warraweena gold and copper targets
- Geophysical surveys planned for Loch Lilly
- Jillewarra aeromagnetic survey processed and interpreted
- Aircore drilling at Jillewarra deferred pending approvals
Full summary
S2 Resources Ltd provides an update on its exploration activities across its Warraweena, Loch Lilly, and Jillewarra projects in Australia. At Warraweena, a drilling contractor has been engaged to test a gold target and a copper target, with drilling expected to commence in early October. Geophysical surveys are planned for Loch Lilly to assess the effectiveness of magnetometric induced polarization (MIP) before drilling. At Jillewarra, aeromagnetic survey data has been processed and is being interpreted, while aircore drilling is deferred pending approvals from the Department of Mines, Petroleum and Energy (DMPE) and traditional owners.
Sign in for more about this company, including guidance changes and other insights.
Sign in