KSN Price sensitive 8 Sep 2026, 9:21 AM

Jack's Hut Resource Drilling Results

Kingston Resources Ltd

Kingston Resources: Jack's Hut Drilling Results

Key points

  • Excellent infill drilling results confirm existing geological interpretation at Jack's Hut.
  • Results will inform a Mineral Resource update targeting an additional ore source.
  • Surface drilling in October will test depth extensions below existing resource.

Full summary

Kingston Resources Limited has announced positive infill drilling results from the Jack's Hut deposit, located immediately south of the existing underground development at Mineral Hill. The drilling was designed to increase drill density and confirm the existing geological interpretation. The results support the existing geological interpretation and provide additional confidence in the location, continuity, and grade tenor of mineralisation around the conceptual stope areas. The Company is aiming to make Jack's Hut its second underground ore source at Mineral Hill. Surface drilling in October will test potential down dip extensions. The infill results will be incorporated into an updated geological model, with an updated Jack's Hut Mineral Resource estimate targeted for the March quarter of 2027.

Guidance

Updated Jack's Hut Mineral Resource estimate targeted for March quarter 2027

Outlook

Kingston Resources is optimistic about the potential of Jack's Hut as a second underground ore source at Mineral Hill, with upcoming surface drilling expected to test depth extensions.

Sign in for more about this company, including guidance changes and other insights.
Sign in