OD6 Price sensitive 9 Sep 2026, 8:55 AM

BIG JIM ROCKET SPAR ULTRA HIGH-GRADE FLUORSPAR CORRIDOR

OD6 Metals Ltd

OD6 Metals Announces High-Grade Fluorspar Results at Quinn Project

Key points

  • Six samples returned 97% CaF2 or better, including three at 99.9% CaF2
  • Multiple mineralised structures identified across a 700m corridor
  • New Spar prospect located 450m east of Big Jim with grades up to 94.3% CaF2
  • Results support potential for high-grade fluorspar deposits in Nevada
  • Fluorspar grades consistent with recent metallurgical testwork

Full summary

OD6 Metals Ltd has announced significant high-grade fluorspar results from the Quinn Fluorspar Project in Nevada, USA. The results from the Rocket-Big Jim-Spar Corridor show exceptional grades, with six samples returning 97% CaF2 or better, including three at 99.9% CaF2. The corridor extends approximately 700 meters and includes multiple mineralized structures. The newly identified Spar prospect, located 450 meters east of Big Jim, returned grades up to 94.3% CaF2. These results confirm the presence of high-grade fluorspar across at least four mineralized structures, with the corridor remaining open along strike and at depth. The findings support the potential for compact, very high-grade fluorspar deposits, which complement OD6's other projects in the region.

Outlook

The high-grade fluorspar results from the Quinn Project reinforce OD6's strategic position in the U.S. fluorspar market, offering potential for premium Metspar and Acidspar products.

Sign in for more about this company, including guidance changes and other insights.
Sign in