Viking Mines Reports Significant Scheelite Zones at Linka
Key points
- Drilling extends priority target zones at Linka
- Significant visual intercepts of scheelite identified
- Assay results expected in 6-8 weeks
- Strong tungsten pricing supports potential for restart
- Drilling to resume mid-October
Full summary
Viking Mines Limited (ASX: VKA) reports further strong visual intercepts of scheelite in RC drilling at the Linka Tungsten Project in Nevada, USA. The drilling extends priority target zones and shows significant widths of scheelite mineralization identified visually through shortwave UV fluorescence. Notable intercepts include 22m over a 24m horizon from 55m and 10m over a 12m horizon from 70m. Assay results are expected in 6-8 weeks. The US tungsten environment is supportive, with strong pricing and government backing for domestic production.
Outlook
The Company's near-term workstreams include completing the maiden RC drilling program, reporting progress and assay results, ongoing metallurgical testwork, and identifying toll treatment options.
Sign in for more about this company, including guidance changes and other insights.
Sign in