FRS Price sensitive 18 Sep 2026, 10:10 AM

Johnson Range Pre-Feasibility Study and Ore Reserve

Forrestania Resources Ltd

Forrestania Resources Announces Johnson Range Pre-Feasibility Study

Key points

  • Johnson Range Pre-Feasibility Study shows high-grade gold production potential
  • Ore Reserve of 308kt at 2.88g/t Au for 28.5koz Au estimated
  • Estimated pre-tax undiscounted free cash flow of A$60.1 million at A$5,500/oz
  • Mining scheduled over 11 months, processing over 3 months at AISC of A$2,905/oz
  • Total project capital estimated at approximately A$8.0 million

Full summary

Forrestania Resources Ltd has announced the Johnson Range Pre-Feasibility Study (PFS) and Ore Reserve, demonstrating a near-term high-grade gold production opportunity. The PFS highlights a short-life, near-term development opportunity with a fully underpinned Production Target. The Ore Reserve for the Johnson Range Deposit is estimated at 308kt at 2.88g/t Au for 28.5koz Au (100% Probable). The study estimates a pre-tax undiscounted free cash flow of A$60.1 million at a gold price of A$5,500/oz over a 12-month project life. Mining is scheduled over approximately 11 months, with processing occurring over a three-month period, at an average All-In Sustaining Cost (AISC) of A$2,905/oz. Ore is planned to be hauled approximately 236km by road to Forrestania's Edna May processing facility, leveraging existing processing infrastructure. The estimated total project capital is approximately A$8.0 million. The average metallurgical recovery of approximately 92% is adopted in the PFS.

Guidance

Estimated pre-tax undiscounted free cash flow of A$60.1 million at A$5,500/oz

Outlook

Forrestania Resources is strategically positioned to leverage its Edna May processing infrastructure, with potential for resource conversion and mine life extension through future drilling and technical work.

Sign in for more about this company, including guidance changes and other insights.
Sign in