Rochefort Drilling Complete: Sheared, Sulphide-Bearing Dolerite Intersected
Key points
- Eight-hole, 1,896 m follow-up RC program completed at Rochefort Gold Prospect
- Shear zones containing pyrrhotite and pyrite logged within the target fractionated dolerite
- All samples submitted to the laboratory, with gold assays expected in 4-6 weeks
- Regional targeting advancing in parallel on the newly interpreted syncline and cross-cutting structural corridor at Abbotts
- Field reconnaissance planned in October 2026 ahead of aircore drilling
Full summary
PLC Resources Ltd has completed an eight-hole, 1,896m follow-up Reverse Circulation (RC) drilling program at the Rochefort Gold Prospect, part of the Abbotts Gold Project in Western Australia. The program aimed to step out from the maiden RC program in May 2026, which indicated low-level but consistent gold anomalism. Geological logging identified sheared zones containing pyrrhotite and pyrite within the target fractionated dolerite, together with magnetite-bearing intervals. All samples have been submitted to the laboratory for gold analysis, with results expected in approximately four to six weeks. In parallel, the Company is advancing a second group of targets at Abbotts, where airborne magnetic interpretation has defined a syncline and cross-cutting structural corridor. Field reconnaissance will be completed ahead of planning an aircore drilling program.
Summary generated by a large language model. Please interpret with care.