BPM Minerals Reports High-Grade Gold Assays at Beachcomber
Key points
- 18m @ 4.93 g/t Au from 245m
- High-grade mineralisation open to the south and down dip
- Maiden JORC compliant MRE targeted for H1 2027
Full summary
BPM Minerals Ltd has reported assay results from the first 9 RC drill holes completed at the Beachcomber Main Lode as part of the ongoing 20,000m Reverse Circulation (RC) drilling program at the Forelands Gold Project in Western Australia. Key highlights include 18m @ 4.93 g/t Au from 245m, with significant high-grade intercepts such as 1m @ 10.12 g/t Au from 246m and 2m @ 16.62g/t Au from 252m. The results demonstrate the consistency of the high-grade component of the Beachcomber Main Lode and will underpin a maiden JORC compliant Mineral Resource Estimate (MRE) in H1 2027. Drilling continues to infill and extend the mineralised footprint of the Beachcomber Main Lode, with the lode remaining open down plunge.
Outlook
The company expects to release further drill results from the broader Beachcomber Prospect over the coming quarter, with a maiden JORC compliant Mineral Resource Estimate targeted for H1 2027.
Summary generated by a large language model. Please interpret with care.