HCH Price sensitive 8 Oct 2026, 9:10 AM

Shallow Cu-Au Intersections Grow La Verde

Hot Chili Ltd

Hot Chili Ltd Announces Positive Drilling Results at La Verde

Key points

  • Shallow copper-gold intersections continue to grow at La Verde
  • Significant intersections include DKP075, DKP067, and DKP078
  • Drilling supports the scale and continuity of near-surface mineralisation

Full summary

Hot Chili Ltd is pleased to announce ongoing high-grade drill results from its La Verde Cu-Au porphyry discovery, located 30 km south of the Costa Fuego Cu-Au Project in Chile. The latest drilling has extended the depth of the high-grade zone, with significant intersections including DKP075 (188 m grading 0.56% CuEq), DKP067 (112 m grading 0.47% CuEq), and DKP078 (240 m grading 0.43% CuEq). These results support the current geological interpretation of La Verde, developed from over 35,000 m of drilling. The company is progressing towards the completion of a maiden Mineral Resource Estimate for La Verde later this year, which is expected to be integrated into a revised Costa Fuego Pre-Feasibility Study.

Outlook

The company is targeting completion of a maiden Mineral Resource Estimate for La Verde later this year, which will be integrated into a revised Costa Fuego Pre-Feasibility Study.

Summary generated by a large language model. Please interpret with care.

Sign in for more about this company, including guidance changes and other insights.
Sign in