Brookside Energy Completes Final Downhole Operations
Key points
- Isolation plug drill-out operations completed in Sabres and Whalers wells
- Production tubing installed in both wells
- Final major downhole work completed ahead of flowback
Full summary
Brookside Energy Limited (ASX: BRK) has completed isolation plug drill-out operations and installed production tubing in both Sabres and Whalers wells at the Suttles Pad in the SWISH Play, southern SCOOP, Anadarko Basin, Oklahoma. These operations follow the completion of a 64-stage stimulation program and represent the final major downhole work required before flowback. With all major drilling and completion execution risks retired, the focus now shifts to final production preparations and initiating flowback, leading to the wells' sales commencement.
Summary generated by a large language model. Please interpret with care.