| 4 Dec 2025 | The estimated Phase One Lionheart economics for the FID Case include an average annual revenue of €566m, average annual EBITDA of €427m (75% EBITDA margin), CAPEX of €1,476m, and OPEX (C1) of €3,588/t LHM. The project has a pre-tax NPV8 of €1,838m and pre-tax IRR of 15.6% unlevered and 19.0% levered. | |
| 3 Dec 2025 | Phase One Lionheart is targeted to commence first commercial lithium hydroxide production in 2028, with an initial production capacity of 24,000 tonnes per annum, enough for approximately 500,000 electric vehicle batteries per year. The project will also produce 275 GWh of renewable power and 560 GWh of heat per annum for local consumers over an estimated 30-year project life. | |
| 19 Nov 2025 | The Phase One Lionheart Project will have the capacity to produce 24,000 tonnes of lithium hydroxide monohydrate (LHM), enough for around 500,000 battery electric vehicles per annum, in addition to 275 GWh of power and 560 GWh of heat. |
Sign in to see the full guidance history.
Most followed in Materials
Follow VUL to get its announcements emailed to you, with AI summaries, the full announcement and guidance history, and its most significant announcements.
Sign in