GA8 Price sensitive 21 May 2026, 8:17 AM

RC Results Continue to Confirm Grade Continuity-Mt Stirling

Goldarc Resources Ltd

GA8 Announces Positive RC Results at Mt Stirling

Key points

  • Third batch of assay results confirm grade continuity
  • High-grade intercepts include 1m @ 9.46g/t Au
  • Results extend coverage into the central sector
  • Grade control program funded by BML Ventures

Full summary

GoldArc Resources Limited (ASX:GA8) has announced the third batch of assay results from the Reverse Circulation (RC) grade control program at the Mt Stirling gold deposit in Western Australia. The results continue to confirm the grade and continuity of high-grade gold shoots, providing valuable data for ongoing mine planning and optimization. Notable intercepts include 1m @ 9.46g/t Au and 4m @ 5.28g/t Au. Approximately 38% of the 34,000m grade control program has been completed, with further assay batches expected to be reported progressively. The program is fully funded by BML Ventures Pty Ltd under a 50/50 net profit share arrangement.

Summary generated by a large language model. Please interpret with care.

Sign in for more about this company, including guidance changes and other insights.
Sign in