RC Drilling Completed at Rochefort Gold Prospect

Open PDF
Stock PREMIER1 Lithium Ltd (PLC.ASX)
Release Time 26 May 2026, 8:26 a.m.
Price Sensitive Yes
 PLC Completes RC Drilling at Rochefort Gold Prospect
Key Points
  • Maiden RC drilling program completed at Rochefort Gold Prospect
  • Located ~20km north of Crown Prince deposit
  • Drill holes intersected quartz veining and sulphide mineralisation
  • Samples dispatched for analysis, results expected in 4-6 weeks
Full Summary

PLC Resources Limited has completed its maiden Reverse Circulation (RC) drilling program at the Rochefort Gold Prospect, located approximately 20km north of the Crown Prince deposit. The program involved drilling five RC holes totaling 1,018 meters, intersecting quartz veins, sulphide mineralisation, and potassic alteration. These features are consistent with gold-bearing hydrothermal systems. Samples have been sent to Intertek's laboratory for analysis, with results expected within 4 to 6 weeks. The company will evaluate the outcomes and determine any follow-up exploration activities.