KSN Price sensitive 16 Jun 2026, 9:52 AM

Investor Presentation - Unlocking Mineral Hill Potential

Kingston Resources Ltd

Unlocking Mineral Hill Potential

Key points

  • Kingston Resources to expand Mineral Hill with a 25,000m drilling program
  • Plant expansion studies planned to increase throughput to 700ktpa
  • Strong balance sheet with $45m from Misima sale
  • Near-term catalysts include Mineral Resource updates and drilling results
  • Strategic avenues being assessed to maximize shareholder value

Full summary

Kingston Resources Limited is set to unlock the potential of Mineral Hill through an aggressive exploration and expansion strategy. The company plans to execute a 25,000m drilling program over the next 12 months to expand the resource and reserve base, aiming for a robust, material increase to the life of mine (LOM) and new discoveries. The company's fully permitted 350ktpa polymetallic plant in the South Cobar Basin is strategically positioned to process ores from Mineral Hill and the region. Plant expansion studies are planned to increase throughput to 700ktpa. The company has a strong balance sheet, with $45.0m in additional value expected from the Misima sale. Near-term catalysts include Mineral Resource updates, ongoing drilling and assay result updates, potential discovery of additional near-mine deposits, and plant expansion studies.

Outlook

Kingston Resources anticipates significant value creation through Mineral Hill's expansion, with a focus on resource growth, plant optimization, and strategic value maximization.

Summary generated by a large language model. Please interpret with care.

Sign in for more about this company, including guidance changes and other insights.
Sign in